A contract was signed by CGC – Abu Dhabi Branch

January 3, 2014

Ground Works, Asphalt Works, Infrastructure Works, Concrete Buildings and Steel Structures. Tender No: (MW-AF-240-2009). Amount: AED 99,073,700.80/- (Equivalent to about: KD 7,601,560/-). Execution Period: 14 months.

Download PDF

More News